Visitor Information
About the Museum
Opening Times
Major Operating Days
Bus Services
Admission Prices
Accessibility
How to Get Here
Where to Stay
Picture Gallery
Take a Ride
Bus Services
Private Hire Bookings
Private Hire Fleet
Our Collections
Buses & Coaches
Battery Electric
Other Vehicles
Archives and Artefacts
The Museum Project
The Story So Far
The Future
Latest News
Your Support
Educational
Facilities
Transport History
Kids Stuff
 
Visit or online shop or Make A Donation

 

  

 Omnibus 172 - May 2006

HLF-SPRING INTO ACTION

Following on from “The ‘Prospect Before Us” in the ‘Omnibus’ no.170, it is intended to keep readers informed of progress towards our goal of a new display hall by Easter 2007 in each edition of ‘Omnibus’.

It is often true that when things disappear one does not notice that they have gone and even, sometimes, cannot think what was in the space left. This is the stage we have reached with the HLF project. There is nothing new that has appeared on site to show for it but things have been moved and disappeared. The mezzanine floor which was constructed last summer is not, strictly speaking, part of the HLF project but nevertheless is an essential part in clearing what was the blind store and the railway carriages. A lot of effort has gone in to identifying new homes for the items stored in both these places and then moving them. Special racking has been constructed in the mezzanine and as I write – late January – the task of shifting everything is nearly complete. 

My predictions in ‘Omnibus’ no.171 of the new access road to Scania Hall and the complete removal of the railway carriages by Easter are looking a little optimistic at the time of writing this update (late March). Progress is being made on both fronts. The area alongside the café/shop building is now ready for the contractors, the plans have been approved and our architects are organising tenders for the work. Two of the railway carriages have been stripped of more or less everything apart from the remaining steel and wooden floor. The other two are minus all the windows, doors and much of the interior fittings but still need work to get them to a stage that makes them more attractive to scrapmen. Obviously, if these remains have not gone by Easter, more of the orange fencing will be required to keep the public away from them.

Otherwise, all the HLF related work is in the background with our architectural team producing the full specification to allow us to tender for the main construction work of the Power Hall, as the new exhibition building will be named. The steelwork has a rather longer lead-time so a separate contract for the supply of this has already been awarded.

Phil Ireland